To customize each of the packages, you can proceed with customization after selecting any of them:
Select | Work Description | Fee (IRR) | Unit | Total (IRR) |
---|---|---|---|---|
Site visit by expert | 30,000,000 | Daily | ||
As-Built Drawing | 300,000 | Square meter | ||
2D Equipment Layout Design | 1,125,000 | Square meter | ||
Phase 1 Equipment Drawing | 150,000 | Square meter | ||
Mechanical Systems Drawing (Phase 1) | 30,000 | Square meter | ||
Electrical Systems Drawing (Phase 1) | 30,000 | Square meter | ||
Mechanical Systems Design & Calculations (Phase 2) | 375,000 | Square meter | ||
Electrical Systems Design & Calculations (Phase 2) | 375,000 | Square meter | ||
Architectural Design Phase 2 (Revit) | 450,000 | Square meter | ||
Electrical Calculations for Refrigeration Equipment | 75,000,000 | Project | ||
Phase 1 Lighting Drawing | 30,000 | Square meter | ||
Lighting Design & Calculations (DIALux) | 75,000 | Square meter | ||
3D Modeling (Sketch-up) | 750,000 | Square meter | ||
3D Modeling (Blender) | 1,050,000 | Square meter | ||
Interior Architectural Design (Interior Decoration) | 3,000,000 | Square meter | ||
Facade and Landscaping Design | 3,750,000 | Square meter | ||
Measurement and Estimation (Volume Calculation) | 30,000 | Square meter | ||
Physical Documentation | 75,000 | Square meter | ||
Final Software and Physical Documentation (Final Book) | 150,000 | Square meter |